Sprue & Runner Recycling — Injection Molding Plant Producing Appliance Parts

发布时间:2026-07-07浏览次数:75

Case Study | Sprue & Runner Recycling — Injection Molding Plant Making Appliance Parts

改.png

For injection molders, sprues and runners are raw material you have already paid for. Grinding them back into clean regrind on site lets you reuse up to 25% of your feed, cut your virgin-material bill, and clear your workshop floor. Here's how one appliance-parts plant did it.

The customer and the site

  • Products: injection-molded appliance housings, switch panels and internal brackets, mainly in ABS/PP

  • Scale: 8 injection molding machines (120–250T), two shifts, ≈20 hours of operation per day

  • Waste source: every shot carries a sprue and runner; operators snap them off with pliers and drop them into bins beside each machine

  • Waste volume: 1–2 bins per machine per day — ≈250 kg/day across the plant

  • Waste form: solid sprues and runners (some with residual material), harder and denser than virgin pellets

How it used to be handled

  • Sprue was stockpiled for 3–5 days and sold to a scrap dealer at scrap price — or shipped out as industrial waste, at the plant's own cost.

The problems before

  • Price leakage: selling sprue at scrap price instead of reusing it at virgin price loses several thousand RMB per ton

  • Outsourced grinding didn't pay: processing fees plus freight — and the material left the plant for good

  • Workshop burden: piles took up floor space and blocked aisles; in peak season, sprue bins spilled into the walkways

The solution


StepHow it works
Crusher placementCrusher sits in a centralized area at the back of the workshop, right next to the sprue staging point — plug in and run
FeedingAt shift end, workers wheel the collection bins over and dump them straight into the large hopper — no pre-cutting
CollectionDrawer-style collection box slides out when full and empties directly into regrind bags
ReuseRegrind blended with virgin material at 15–25% (top up color masterbatch to match); dark-colored and interior parts can take a higher ratio, visible parts keep a lower ratio to protect surface quality
SurplusUnused regrind is bagged and sold at regrind prices — more valuable than raw sprue

Results (example calculation)


ItemFigure
Sprue recovered per month6 tons (250 kg/day × 24 working days)
Reused in place of virgin material3.6 t/month (60% reuse rate)
Raw material saved≈ RMB 43,000/month (3.6 t × RMB 12,000/t)
Disposal / outsourced grinding saved≈ RMB 3,000–6,000/month
Total material-side savings≈ RMB 500,000/year

Calculation basis: like-for-like substitution (1 t of sprue reused ≈ 1 t less virgin purchased), before electricity and process losses. Actual savings = reused volume × (virgin price − total regrind cost).

One-liner: Turning 250 kg of daily sprues into reusable regrind — this plant cuts its virgin material bill by roughly RMB 43,000 per month.

Get your own numbers (optional CTA): Tell us your machine sizes, materials and daily sprue volume — we'll calculate what in-plant grinding could save your plant.

Note: Figures are example calculations based on assumed parameters (material price, reuse rate, operating days) and will vary with each plant's actual conditions.